Sunday, December 9, 2007

Brickwork about 85% complete, but with a leaking tap

This week, it was clear the brickwork is nearing completion. The brickie said he still had to do the window sills, the pillars at the front for the entry and southern side and to finish the fireplace.

Unfortunately, we have a leaking tap - leaking for the last two weeks. We've left messages and emails with Eden Brae (who were re-locating last week), but the leak is still there. We'll see what happens this week.

Here are some photos:

The front walls are almost complete

The southern wall is now complete apart from the window sills

The top on the fireplace still needs to be done.


The leaking tap (with the hose attached). It's hard to see in the picture but it's dripping at the rate of a drop every 2 seconds. The pool of water is related to both the leak and a savage storm the day before.

2 comments:

Matt Walker said...

What the?

You are paying for that "water leak".

I would be screaming about now if I were you.

jamie&kath said...

Don't worry...I did and it's fixed