The roof tiles, guttering and sarking went on this week because the weather has been wet in Sydney and is expected to continue. There is still some brickwork outstanding though. Some window sills and the pillars for the front facade, particularly the front porch, are still outstanding and these things should be done early in the new year. Hoepfully, some of the brickwork issues shown in the following pictures will be fixed as well:
Alfresco area - the guttering is Dune colour
The front facade - the "lighter" bricks will be rendered over.
I've never seen this before. The weepholes go up the wall and then across.
Some misaligned bricks above the alfresco - to be fair these bricks were done quickly to avoid more weather delays so the roof could go on. However, it is still unacceptable. We'll be employing an inspector to formalise this issue as well as inspect the rest of the home.
This picture shows a missing brick in the bottom right hand corner of the wall near where the the stormwater pipe is. I assume this brick will be replaced!!
The front facade - the "lighter" bricks will be rendered over.
I've never seen this before. The weepholes go up the wall and then across.
Some misaligned bricks above the alfresco - to be fair these bricks were done quickly to avoid more weather delays so the roof could go on. However, it is still unacceptable. We'll be employing an inspector to formalise this issue as well as inspect the rest of the home.
This picture shows a missing brick in the bottom right hand corner of the wall near where the the stormwater pipe is. I assume this brick will be replaced!!