We had our maintenance inspection today. There were only about 15 things on the list. Most of the issues are from movement as the house settles. However, we've had our other trades fixing little issues as they go. Some of the issues already fixed by our trades:
Roof leak from tile not sitting correctly (caused an external light to fill with water and short out).
Render not done properly at the front
Colour-blind apprentice electrician wired neutral and active back-to-front in a power point.
Crossed neutrals in some of the RCDs causing the power to cut out
Wiring the smoke detectors together (required by law)
Weeks ago, we had some urgent issues fixed the same day by Eden Brae, including a gas leak from one of the bayonets and some missing powerpoints.
Wednesday, October 29, 2008
Subscribe to:
Posts (Atom)